EasyManua.ls Logo

KPI-JCI FT4240 - User Manual

Default Icon
204 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
OperOper
OperOper
Oper
aa
aa
a
tion & Maintenancetion & Maintenance
tion & Maintenancetion & Maintenance
tion & Maintenance
FF
FF
F
ast ast
ast ast
ast
TT
TT
T
rr
rr
r
axax
axax
ax
Impact Cr Impact Cr
Impact Cr Impact Cr
Impact Cr
ushing Plantushing Plant
ushing Plantushing Plant
ushing Plant
HyHy
HyHy
Hy
drdr
drdr
dr
aulic Driaulic Dri
aulic Driaulic Dri
aulic Dri
vv
vv
v
ee
ee
e
IB-0271 9/09
Question and Answer IconNeed help?

Do you have a question about the KPI-JCI FT4240 and is the answer not in the manual?

Summary

Introductory Pages

About This Manual

Provides information on the manual's purpose, structure, and special notations for safe operation.

Serial Number Plates

Explains the importance of serial numbers for identifying components and ordering parts.

Buying Replacement Parts

Details on obtaining replacement parts through authorized dealers and the role of serial numbers.

Lubricants and Fluids

Specifies factory fill lubricants and recommended fluids for bearings, pivot points, and hydraulic systems.

Storage Procedures

Provides a step-by-step guide for storing the impact crushing plant to prevent corrosion and deterioration.

Drawing List

Lists available electrical and hydraulic drawings for FT4240 and FT4250 models.

Specifications

FT4240 Specifications

Detailed physical and performance specifications for the FT4240 model.

FT4250 Specifications

Detailed physical and performance specifications for the FT4250 model.

Introduction to the Impact Crushing Plant

Plant Overview and Orientation

Defines plant orientation based on material flow and identifies feed and discharge ends.

Key Plant Components

Describes the function of major components like the impactor, rotor, aprons, and blowbars.

Vibrating Feeder System

Explains the feeder's vibrating mechanism, grizzly, bypass chute, and hopper design.

Vibrating Screen System

Details the vibrating screen system, including its mechanism, support, and conveyor connections.

Conveyor Systems (Recirculating, Side Delivery, Magnet)

Describes recirculating, cross, side delivery conveyors, and the optional magnet system.

Water Spray and Track Systems

Explains the optional water spray system and the hydraulic track drive system.

Fuel Tank and Engine Information

Provides details on fuel tank capacity and specifications for CAT and Cummins engines.

Control Panel Functions

Describes the components and functions of the onboard control panel and remote operation.

Hydraulic System Overview

Details the plant's hydraulic system, pumps, motors, and oil reservoir.

Safety First!

General Safety and Responsibilities

Outlines owner, employer, and operator responsibilities and general safety practices.

Assembly, Operation, and Maintenance Safety

Provides specific safety guidelines for assembly, operation, and maintenance tasks.

Hydraulic, Transport, and Magnet Safety

Details safety precautions related to hydraulic systems, transport, and magnetic fields.

Lockout;Tagout and Energy Control Procedures

Explains lockout/tagout procedures for controlling energy hazards during service.

Hazard Areas and Safety Decals Identification

Identifies specific hazard areas and safety decals on the equipment.

Application

Crushing Plant Configurations and Material Flow

Describes open and closed circuit configurations and material handling processes.

Crusher Application Guidelines and Blowbar Selection

Covers feed size, blowbar types, and application-specific recommendations.

Feed Size, Prepping, and Loading Practices

Details feed size guidelines, material prepping, and loading methods for efficient operation.

Site Selection and Preparation

Optimal Plant Location and Work Site Requirements

Guidelines for selecting a suitable site, ensuring level ground, and proper drainage.

Material Presizing and Loading Procedures

Recommends presizing material and using excavators for efficient plant loading.

Engine Start-up and Shutdown

Engine Start-up and Plant Start-up Procedures

Step-by-step instructions for starting the engine and initiating plant operations.

Engine Shutdown Procedure

Provides the correct procedure for safely shutting down the engine and plant systems.

Plant Start-up Sequence

Outlines the sequence for starting plant operations after the engine is running.

Cold Weather Startup

Cold Weather Considerations and Preparations

Guidelines for preparing the machine and selecting appropriate lubricants for cold conditions.

Cold Weather Starting Procedures and Aids

Details starting procedures and available aids for operating in cold temperatures.

Fuel and Lubricant Recommendations for Cold Weather

Advises on fuel types and lubricants suitable for cold weather operation.

Engine Starting Information by Temperature Category

Categorizes cold weather starting aids based on temperature and altitude.

Unloading the Impact Crushing Plant

Plant Unloading Procedures and Setup

Instructions for safely unloading the plant from a trailer and initial setup.

Component Setup and Adjustments

Guides for setting up conveyors, bypass chutes, and hydraulic cylinders.

Impactor Apron Settings

Details on checking and adjusting primary and secondary apron settings for product size control.

Preoperation Checklist

Preoperation Checks: Sheet Metal, Electrical, Engine

Checklist items for sheet metal, electrical system, and engine components before operation.

Preoperation Checks: Lubrication, Hydraulics, Conveyor Belt

Checklist items for lubrication, hydraulic system, and conveyor belt condition.

Preoperation Checks: Impactor, General, Radio

Checklist items for impactor, general plant condition, and radio system.

No Load Operational Checklist

Operational Checks: Engine, Hydraulics, Belt, Conveyors

Verifies engine, hydraulic controls, belt, and conveyor systems at no load.

Operational Checks: Crusher, Feeder, Speeds, Settings

Verifies crusher, feeder, speeds, and settings during no-load operation.

Operating Controls

Main Control Panel and Power Unit

Describes the main control panel, engine controls, and power unit operation.

Hydraulic Controls for FT4240 Model

Details the hydraulic control functions for operating conveyors and the crusher lid on FT4240.

Hydraulic Controls for FT4250 Model

Details the hydraulic control functions for operating conveyors and the crusher lid on FT4250.

Overload Protection System

System Components and Basic Principles

Explains the overload protection system's function, components, and operating principles.

Navigating Diagnostic and Data Screens

Guides on navigating through the diagnostic screens for troubleshooting and monitoring.

Operator Password and Settings Management

Describes accessing and changing crusher setpoints, overload control, and language.

Diagnostic Window Explanations and Troubleshooting

Explains various diagnostic windows for identifying and troubleshooting system issues.

Hydraulics - FT4240

FT4240 Track Drive Hydraulic System

Details the hydraulic system for the FT4240 track drive, including pumps and motors.

FT4240 Crusher Drive Hydraulic System

Describes the hydraulic system for the FT4240 crusher drive, including pump and motor.

FT4240 Feeder Drive Hydraulic System

Explains the hydraulic system for the FT4240 vibrating feeder drive.

FT4240 Undercrusher Conveyor Hydraulic Circuits

Details the hydraulic circuits for the FT4240 undercrusher conveyor and setup functions.

FT4240 Stacker and Side Delivery Conveyor Hydraulics

Describes the hydraulic systems for FT4240 stacker and side delivery conveyors.

FT4240 Closed Circuit Hydraulic Option

Explains the hydraulic system for the FT4240 closed circuit option.

Hydraulics - FT4250

FT4250 Track Drive Hydraulic System

Details the hydraulic system for the FT4250 track drive, including pumps and motors.

FT4250 Crusher Drive Hydraulic System

Describes the hydraulic system for the FT4250 crusher drive, including pump and motor.

FT4250 Feeder Drive Hydraulic System

Explains the hydraulic system for the FT4250 vibrating feeder drive.

FT4250 Undercrusher Conveyor Hydraulic Circuits

Details the hydraulic circuits for the FT4250 undercrusher conveyor and setup functions.

FT4250 Stacker and Side Delivery Conveyor Hydraulics

Describes the hydraulic systems for FT4250 stacker and side delivery conveyors.

FT4250 Closed Circuit Hydraulic Option

Explains the hydraulic system for the FT4250 closed circuit option.

Adjustments

Impactor Settings: Chamber Cleaning and Apron Adjustment

Procedures for cleaning the impactor chamber and adjusting apron settings.

First and Second Stage Apron Adjustment Procedures

Detailed steps for adjusting the first and second stage aprons for optimal crushing.

Vibrating Screen Stroke and Belt Training

Instructions for adjusting vibrating screen stroke and training conveyor belts.

Track Tensioning and Feeder Gear Timing

Procedures for properly tensioning tracks and adjusting vibrating feeder gear timing.

Conveyor Removal

Tools and General Notes for Conveyor Removal

Lists required tools and provides general procedural notes for conveyor removal.

Recirculating and Underscreen Conveyor Removal Steps

Step-by-step instructions for removing the recirculating and underscreen conveyors.

Cross Conveyor Removal Procedures

Provides methods for removing the cross conveyor using preferred or alternative techniques.

Undercrusher Conveyor Removal Steps

Detailed procedure for removing the undercrusher conveyor and its components.

Maintenance

10-Hour Maintenance Checks

Routine checks and inspections required every 10 operating hours.

50-Hour Maintenance Checks

Routine checks and inspections required every 50 operating hours.

250-Hour Maintenance Checks

Tasks and checks required every 250 operating hours, including fluid changes.

1000-Hour Maintenance Tasks

Tasks and checks required every 1000 operating hours, including filter and coolant service.

2000-Hour Maintenance Tasks

Maintenance tasks required every 2000 operating hours, focusing on air filter service.

As Needed Maintenance and Wear Items

Covers maintenance for batteries, blowbars, and other components as needed.

Blowbar Rotation and Installation Procedures

Detailed steps for rotating and installing blowbars on the impactor rotor.

Apron Wear Tip and Screen Cloth Replacement

Instructions for replacing worn apron tips and screen cloth for optimal performance.

Belt Splice and Air Filter Maintenance

Procedures for conveyor belt splice installation and air filter replacement.

Lubrication

10-Hour Lubrication Schedule and Points

Specifies lubrication intervals and points for impactor, feeder, and screen bearings.

50-Hour Lubrication Schedule and Points

Details lubrication requirements for pulley bearings and undercrusher conveyor.

250-Hour Lubrication Schedule and Points

Covers lubrication for vibrating feeder gearbox and track drive hubs.

1000-Hour Lubrication Schedule and Points

Specifies lubrication for flop gate bearings, vibrating screen bearings, and track drive hubs.

Emissions

Engine Emissions Standards and Performance Data

Presents engine emission standards, performance data, and fuel flow rates.

Altitude Capability and Noise Levels

Provides data on engine capability at different altitudes and typical noise levels.

Appendix A

Auxiliary Conveyor Capacities

Tables detailing capacities and specifications for Series 2, 11, and 13 conveyors.

Appendix B

Overload Protection System PLC Parameters

Lists PLC parameters for overload protection across various unit models.

Appendix C

CAT Engine Diagnostic Codes

A comprehensive list of CAT engine diagnostic codes with their descriptions.

Appendix D

Electrical Schematics Overview

Reference to electrical schematic diagrams for the crushing plant.

KPI-JCI FT4240 Specifications

General IconGeneral
BrandKPI-JCI
ModelFT4240
CategoryDC Drives
LanguageEnglish