21
EN
Step 14: Prepare the two double side panels for installation as shown in the diagram below. Both pa-
nels will be in mirror image - the number of hooks at the bottom of both panels diers for the BSL and
BSP versions of the unit (see drawings below). The upper fastening screws should also be screwed only
partially (a few threaded coils), as was the case in the lower panels, so as to leave room for mounting
the upper frame, the supporting structure of the installation.
Panel lewy w wersji BSL Panel lewy w wersji BSP
ZACZEP
ZACZEP
Left panel in the BSL version
Clip
Clip
Left panel in the BSP version