Biomass Heating Systems
KWB Multifire 15 - 100 kW
Heating System for Wood chips
and Pellets
Installation and Maintenance Manual

Table of Contents

Questions and Answers

  • A
    Anthony LarsenAug 12, 2025
    What to do if KWB Heating System fuel extractor motor is overloaded?
    • C
      cunninghamheatherAug 12, 2025
      If the motor of the supplemental fuel extractor is overloaded, it could be due to foreign objects in the fuel. Open the overfill protection cover on the worm trough and remove any foreign objects. Alternatively, the wood chips may be too large or too fine. Use standardized wood chips (G30 = max. piece length approximately 30 mm). A failed mains phase could also be the cause, so check the power supply.
  • R
    Ricky SerranoAug 16, 2025
    What to do if the fuel extractor module supply is interrupted in KWB Multifire USV 15/25 V Heating System?
    • F
      Frederick MichaelAug 16, 2025
      If the supply to the fuel extractor module is interrupted, first check the CEE plug-in connector to ensure the fuel extractor module is properly plugged in. If the issue persists, it could be due to one or more tripped glass-tube fuses, a connector malfunction in the three-phase current module, or a missing/short-circuited 24-volt supply voltage. In such cases, notify customer service.
  • M
    Mary SantosAug 19, 2025
    What to do if the overfill protection switch of the KWB Multifire USV 15/25 V Heating System fuel extractor is overloaded?
    • D
      David SantiagoAug 20, 2025
      If the overfill protection switch of the fuel extractor is overloaded, switch off the main switch and switch it on again to open the fire shutter. Then, open the overfill protection cover and remove all the wood chips in this area. This issue typically arises when the shaft is clogged, preventing the worm from getting stuck.
  • C
    Craig BryantAug 23, 2025
    How to fix network error on KWB Multifire USV 15/25 V Heating System fuel extractor module?
    • C
      christine96Aug 23, 2025
      A network error on the fuel extractor module indicates a communication problem on the internal bus between the boiler control unit and the fuel extractor module. Check whether the bus cabling is in order and whether power is supplied. If the alarm cannot be eliminated, notify customer service.
  • C
    carrollkaraAug 27, 2025
    What to do if KWB Multifire USV 15/25 V supplemental fuel extractor motor is overheated?
    • P
      Paul JacksonAug 27, 2025
      If the motor of the supplemental fuel extractor is overheated, it is possible that the thermal motor protection has tripped. Open the overfill protection cover on the worm trough and remove any foreign objects from the worm trough.
  • X
    xwrightAug 31, 2025
    How to troubleshoot Power-LED OFF on KWB Multifire USV 15/25 V?
    • R
      Richard BlackAug 31, 2025
      If the Power-LED is OFF, check the line voltage to the module (3P+N+PE) and inspect the glass-tube fuses in the module. If those are fine, the module might be defective and may need replacement.
  • E
    Evan OrtizSep 3, 2025
    How to troubleshoot BUS-LED OFF on KWB Multifire USV 15/25 V?
    • A
      Albert GomezSep 4, 2025
      If the BUS-LED is OFF, check the line voltage to the module (also on the boiler), inspect the bus cabling, and verify the station number (position 1). Also, check the hardware settings on the boiler control unit. If none of these steps resolve the issue, the module might be defective and require replacement.
  • O
    ortizannaSep 7, 2025
    What causes a defective triac on the KWB Multifire USV 15/25 V fuel extractor module?
    • N
      nicholasbarkerSep 7, 2025
      A defective triac on the fuel extractor module is caused by a defect in the electronics. Notify customer service.

Summary

Introduction

Safety, Warranty, and Site Requirements

Covers safety rules, warranty conditions, and site prerequisites for installation.

System Installation

General Installation Procedures

Overview, tools, and steps for bringing, dismantling, and assembling the system.

Pipe, Electrical, and Control System Connections

Guidelines for smoke pipe, water, electrical connections, junction boxes, and control units.

Fuel Extractor Installation

Comprehensive guide for installing various fuel extractor types.

Final Installation Checks

Final verification and concluding tasks after system installation.

Commissioning

Initial Startup and Parameter Configuration

Procedures for powering on the system and setting essential operating parameters.

System Function Checks

Verifying the correct operation of all system components.

Operation, Specialist

Heating Circuit and Basic Settings Configuration

Settings for heating circuits, DHWC, buffer, and basic system parameters.

Network, Hardware, and Control Unit Settings

Configuring network settings, hardware modules, and control unit parameters.

System Analysis and Troubleshooting Tools

Using relay tests, network analysis, and troubleshooting guides for system operation.

Appendix I

Dimension Sheets

Installation dimensions for various KWB Multifire boiler models.

Hydraulic and Electrical Diagrams

Visual representations of hydraulic circuits and electrical connections.

Appendix II

Fuel Extractor Variants Installation Guides

Detailed installation procedures for different fuel extractor types.

KWB Multifire USV 15/25 V Specifications