EasyManua.ls Logo

L'HOTELLIER 12589-01 User Manual

Default Icon
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Initial issue : APR 01/11
PRINTED IN FRANCE
26-20-50
Page T-1
APR 01/11
L'HOTELLIER
F9211
4 rue Henri Poincaré 92167 ANTONY CEDEX France Tel No. (33) 01.46.66.08.08 Fax No. (33) 01.46.66.23.24
COMPONENT MAINTENANCE MANUAL
WITH
ILLUSTRATED PARTS LIST
FIRE EXTINGUISHER
P/N
12589-01
The document reference is online, please check the correspondence between the online documentation and the printed version.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the L'HOTELLIER 12589-01 and is the answer not in the manual?

L'HOTELLIER 12589-01 Specifications

General IconGeneral
BrandL'HOTELLIER
Model12589-01
CategoryFire Extinguisher
LanguageEnglish

Summary

Service Information Letter

Description and Operation

2. Operation

Explains how the fire extinguisher functions, including cartridge activation and agent release.

Testing and Fault Isolation

1. Testing

Procedures, materials, and equipment for testing the container and identifying defects.

3. Bacharach Leak Test

Procedure for performing a leak test using a Sapre Leak detector or equivalent.

4. Hydrostatic Test

Instructions for conducting hydrostatic tests on containers every five years.

5. Minimum Wall Thickness Test

Using an ultrasonic gauge to measure container wall thickness.

7. Fault Isolation

Table for identifying probable causes and corrective actions for component failures.

Disassembly

3. Disassembly

Detailed steps for disassembling the discharge head and removing agent/nitrogen.

Cleaning

Check

Repair

Assembly

4. Disc Assembly

Procedures for cleaning, installing, and welding the disc assembly to the container neck.

6. Pressure Switch

Aligning and installing the pressure switch correctly with shims.

7. Recharge Kit Set-Up

Instructions for preparing and setting up the recharge kit for filling.

8. Container Fill

Procedure for filling the container with CBrF3 and pressurizing with nitrogen.

10. Weld Fill Plug to Fill Fitting

Procedure for welding the fill plug to the fill fitting after cleaning and drying.

13. Final Assembly

Steps for final assembly, including installing gaskets, nuts, and discharge heads.

Fits and Clearances

Special Tools, Fixtures and Equipment and Consumable

Illustrated Parts List

Storage (Including Transportation)