Polypannel List and Installation Plan
When installing polypannels, please ensure the side with the white film is facing out. This is the side with UV protection.
Also it is advisable to peel the film off, just before installing the panel.
Although two F4 Bolts only seem to be attached to one part at the moment,
Installation of Bolts:
1.Slide bolt into the channel in the aluminium profile.
2.Attach any other parts needed.
3.Place nut on and hand tighten.
4.Once polypannels are installed later in the assembly, use spanner to tighten all nuts.
Please ensure you include these as it will save problems later in the installation:
Throughout the installation you may see diagrams like this:
they are for use later in the installation.