EasyManua.ls Logo

LAMBORGHINI Taura 24 MCS W TOP - User Manual

LAMBORGHINI Taura 24 MCS W TOP
112 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
TAURA 24 MCS W TOP
CALDAIA MURALE A GAS CAMERA STAGNA, PER SANITARIO E RISCALDAMENTO
WALL-MOUNTING GAS BOILER AIRTIGHT CHAMBER, FOR HOT WATER AND HEATING
CHAUDIÈRE MURALE À GAZ CHAMBRE DE COMBUSTION ÉTANCHE, POUR LA PRODUCTION D’EAU CHAUDE SANITAIRE ET LE CHAUFFAGE
CALDERA MURAL DE GAS CON CÁMARA ESTANCA PARA AGUA SANITARIA Y CALEFACCIÓN
CALDEIRA MURAL A GÁS CÂMARA ESTANQUE, PARA PRODUÇÃO DE ÁGUA QUENTE SANITÁRIA E AQUECIMENTO
ΕΠΙΤΟΙΧΟΣ ΛΕΒΗΤΑΣ ΑΕΡΙΟΥ ΣΤΕΓΑΝΟΎ ΘΑΛΆΜΟΥ, ΓΙΑ ΖΕΣΤΌ ΝΕΡΌ ΚΑΙ ΘΈΡΜΑΝΣΗ
cod. 3540D95/0 ediz. 06/2006
AZIENDA CERTIFICATA ISO 9001
I
STRUZIONI PER
L’USO
L'INSTALLAZIONE
E LA MANUTENZIONE
INSTRUCTIONS
FOR USE,
INSTALLATION
AND MAINTENANCE
INSTRUCTIONS
D’UTILISATION,
D’INSTALLATION
ET D’ENTRETIEN
INSTRUCCIONES
PARA EL USO,
LA INSTALACIÓN Y EL
MANTENIMIENTO
INSTRUÇÕES DE
UTILIZAÇÃO
INSTALAÇÃO
E MANUTENÇÃO
ΟΔΗΓIΕΣ ΧΡΗΣΗΣ
ΕΓΚΑΤAΣΤΑΣΗΣ
ΚΑΙ ΣΥΝΤΗΡΗΣΗΣ

Table of Contents

Questions and Answers

Summary

1. OPERATING INSTRUCTIONS

1.1 Introduction to the Taura 24 MCS W TOP

Brief overview of the Taura 24 MCS W TOP boiler.

1.2 Control Panel Overview

Details of the boiler's control panel layout, selector, and LEDs.

1.3 Turning the Boiler On and Off

Step-by-step instructions for igniting and shutting down the boiler.

1.4 Water System Pressure Adjustment

Guidance on setting the correct water system pressure.

2. INSTALLATION GUIDELINES

2.1 General Installation Instructions

Essential guidelines for installation by qualified personnel.

2.2 Recommended Place of Installation

Requirements and suitability for the boiler's installation location.

2.3 Plumbing and Water Connections

Details on connecting water pipes and system requirements.

2.4 Gas Supply Connection

Instructions for safely connecting the gas supply to the boiler.

2.5 Electrical Connections

Guidelines for connecting the boiler to the electrical grid safely.

Room Thermostat and Timer Connections

Notes on connecting room thermostats and timer controls.

Electrical Terminal Board Access

Location of the electrical terminal block and its diagram.

2.6 Fume Ducts and Ventilation

Requirements for fume extraction and outlet ducts.

Diaphragm Installation and Pipe Connections

Diaphragm Selection for Coaxial Pipes

Guidance on choosing diaphragms for coaxial pipe configurations.

Diaphragm Selection for Separate Pipes

Guidance on choosing diaphragms for separate pipe configurations.

Coaxial Pipe Installation Details

Instructions for fitting coaxial fume and air pipes.

Separate Pipe Installation and Loss Calculation

Instructions for separate pipe connections and loss calculation.

3. SERVICE AND MAINTENANCE

3.1 Adjustments and Gas Conversion

Procedures for gas type conversion and burner pressure adjustment.

Test Mode Operation

How to activate and deactivate the boiler's test mode for diagnostics.

Burner Pressure Adjustment Procedures

Detailed steps for adjusting burner pressure settings.

Maximum Heating Output Adjustment

Guidance on adjusting the maximum heating output.

Ignition Power Adjustment

Instructions for adjusting the ignition power.

Installer Parameters Menu Overview

Explanation of the installer parameters and their modification.

Parameter 1: Max Heating Power Setting

Setting the maximum heating power parameter via LEDs.

Parameter 2: Gas Type Selection

Selecting the gas type (Natural Gas or LPG) via LEDs.

Parameter 3: Lighting Power Adjustment

Adjusting the lighting power parameter via LEDs.

Parameter 4: Heating Idle Time Setting

Setting the heating idle time parameter via LEDs.

Parameter 5: Pump Post-Circulation Time

Setting the heating pump post-circulation time via LEDs.

Parameter 6: Heating User Max. Setpoint

Setting the maximum heating temperature setpoint via LEDs.

Parameter 7: Hot Water User Max. Setpoint

Setting the maximum hot water temperature setpoint via LEDs.

Parameter 8: Hot Water Mode Configuration

Configuring the hot water mode setting via LEDs.

3.2 System Start-up Procedures

Pre-ignition Safety Checks

Essential checks before lighting the boiler for safety.

Checks During Boiler Operation

Verification steps during the boiler's normal operation.

3.3 Routine Maintenance

Seasonal Boiler and Flue Inspection Checklist

Annual inspection of boiler and flue for performance and safety.

Boiler Access and Combustion Analysis

Procedure for Opening the Boiler Casing

Steps for safely opening the boiler casing for internal access.

Combustion Analysis Measurement Procedure

Steps for performing and interpreting combustion analysis.

3.4 Troubleshooting Guide

Fault Diagnosis and LED Error Codes

How to interpret the self-diagnosis system and LED fault codes.

4. TECHNICAL SPECIFICATIONS

4.1 Dimensions and Connection Points

Technical drawings showing boiler dimensions and connection points.

4.2 General View and Main Components Identification

Diagram identifying key internal and external boiler components.

4.3 Detailed Technical Data Tables

Comprehensive tables for power, gas, heating, and electrical specifications.

4.4 Installation Diagrams

Pressure vs. Power Performance Diagrams

Graphical representation of pressure-power relationships.

System Head Capacity Diagram

Diagram illustrating the head available for the heating system.

4.5 Electrical Wiring Diagram

LAMBORGHINI Taura 24 MCS W TOP Specifications

General IconGeneral
TypeCondensing
Power Output24 kW
Gas SupplyNatural gas / LPG
MountingWall-mounted
Fuel TypeGas

Related product manuals