Page 4
1
Step
Figure 2
G
ID #
Barrel Nut
Figure 1
Hardware Used In This Step
1. Insert the into the holes in each as shown in
. Make sure the slot on top of the is aligned with
the hole in the end of the rails ( ). Once inserted, use a
to align the with the hole. This will ensure
the nuts will line up properly with the bolts used later.
Barrel Nuts (G) Bed Rail
Figure 1 Barrel Nut (G)
Figure 2 Standard
Screwdriver Barrel Nut (G)
SIDE RAILS
Qty
8