EasyManua.ls Logo

LEHR ST 025CS - Brush Cutter Blade Removal;Installation; Guard Change; Rocker Arm Clearance Adjustment

Default Icon
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRUSHCUTTERBLADEREMOVALI INSTALLATION
t Remove the cotter pin (Fig 38).
CoI_erPin
/
Fi.q..38
2, Insert an allen key into the hole in the shroud to
lock the shaft° Removethe left-hand thread nut to
dissasemble with tool provided in the tool kit (Fig.39),
Fig,.39
3., Remove in the sequence shown (Fig° 40)
ClampPlate_
StarWasher_
Left-HandThreadNut
Fig 40
For reassembfy, install all components in the correct
sequence ( Fig° 40)°
Tighten the left-hand thread nut until snug and install
a new cotter pin,
GUARD CHANGE
NOTE: When using the brush cutter blade remove
the bottom shield attachment by removing the screw,
Replace when using linetrimmer head (Rg 41).
W "_ Screw
Cutling At[achment
She_ld
_ Bottom Shiefd
J Attachment
ROCKER ARM CLEARANCE ADJUSTMENT
This requires partial disassembly of the engine, if you
feel unsure or unqualified to perform this, take the unit
to an authorized service center..
1 Remove the four screws on the engine cover with a
phillips head screw driver (Fig.,42)
2, Remove the engine cover.,
3.. Disconnect the spark plug wire,
4o Clean dirt from around the spark plug_ Remove the
spark plug by using tool provided, turn CCW
NOTE: Inspect the valve to rocker arm clearance with
a feeler gage after the first 25 hours of operation, The
engine must be cold when checking or adjusting the
valve clearances. This task should be performed in a
clean dust free environment,
,=p Enginecover
screws
Figo42
LEHR 1ALLRIGHTSRESERVED2008_2009