EasyManua.ls Logo

Lennox MPB030S4M-*P - Condensate Pipe Work Installation

Lennox MPB030S4M-*P
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
77
Figure 48. MWMA and MWMB Main Control Image
S1+S2
CCM Address
Figure 49. MWMA and MWMB Receiver Control Image (No Operation Switches on Main Control)
14. Condensate Pipe Work Installation
14.1. Outdoor Unit Condensate Piping
Condensate formed during the heating and defrost processes mustbe drained from heat pump units. Drain holes are
providedinthebaseoftheunitstoensureproperdrainage.Heatpumpsmustberaisedwheninstalledonaconcretepador
thegroundtoallowdrainagetooccur.Iftheheatpumpunitisinstalledonwallmountingbrackets,inserttheprovideddrain
connectorintooneofthe1inch(25mm)drainholesandattachedaeld-providedinsulateddrainhosetotheconnector.
Useeld-providedrubberplugstocoveranyunuseddrainholes.

Table of Contents

Other manuals for Lennox MPB030S4M-*P

Related product manuals