14. Condensate Pipe Work Installation
14.1. Outdoor Unit Condensate Piping
Condensate formed during the heating and defrost processes mustbe drained from heat pump units. Drain holes are
providedinthebaseoftheunitstoensureproperdrainage.Heatpumpsmustberaisedwheninstalledonaconcretepador
thegroundtoallowdrainagetooccur.Iftheheatpumpunitisinstalledonwallmountingbrackets,inserttheprovideddrain
connectorintooneofthe1inch(25mm)drainholesandattachedaeld-providedinsulateddrainhosetotheconnector.
Useeld-providedrubberplugstocoveranyunuseddrainholes.