EasyManua.ls Logo

Lenze E82ZBU - Page 10

Lenze E82ZBU
18 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical installation
Wiring with Application−I/O
EDK82ZBU DE/EN/FR 4.1
10
l
H1_E_INST−beisp_en
Wiring with Application−I/O
Setpoint selection through potentiometer and reversal of direction of rotation through
switch
Description of the functionality
ƒ Deceleration after STOP along the quick stop ramp (C0105).
ƒ Deceleration and acceleration after a reversal of the direction of rotation along
ramps C0013 and C0012.
For this, the following is required:
1. Connect the switch/potentiometer unit to the Application−I/O.
2. Configure hardware and software of the motec for a setpoint range of 0 ... 5 V:
Adapt the jumper position at the function module.
Adapt C0034.
3. Configure two digital inputs with the signals CW/QSP and CCW/QSP
Example for terminal configuration C0007 = −16−
7 7
X3
>100k
10k
A4
59
20 28
E1 E2
E3
E4
E5 E6
A2A1
GND
+5V
1=CW 2=CCW
0
0
2
1
min
max
2U
2I
62 63
9
1I
1U
>100k
GND
A
C
B
D
E82ZBU03
Switch/potentiometer unit
Wire bridge
Setpoint selection possible via X3/1U or X3/2U
Wiring for setpoint selection through potentiometer
Wiring for reversal of direction of rotation through switch
CW CW rotation
CCW CCW rotation
Setpoint selection Change of direction of rotation
Terminal
assignment
X3/1U
or
X3/2U
White wire X3/20 Yellow wire
DC supply +20 V
Wire bridge to X3/28
Controller inhibit" (CINH)
X3/9:
Green wire X3/E3 Grey wire = CW rotation
(CW/QSP on X3/E3)
X3/7 Brown wire X3/E4 Pink wire = CCW rotation
(CCW/QSP on X3/E4)
Jumper position
Setpoint on X3/1U: Remove jumper A
Setpoint on X3/2U: Remove jumper B
Parameter setting
Setpoint on X3/1U: C0034/1 = −0−
C0007 = −16−
Setpoint on X3/2U: C0034/2 = −0−

Other manuals for Lenze E82ZBU