- 65 -
Copyright © 2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
4. TROUBLE SHOOTING
4. TROUBLE SHOOTING
4.1. Trouble shooting test setup
< Fig 41. Equipment setup >
Power on all of test equipment
-Connect PIF-UNION JIG or dummy battery to the DUT for power up.
-Connect mobile switch cable between Communication test set and DUT when you need to make a
phone call.
-Follow trouble shooting procedure