EasyManua.ls Logo

LG LAU126HNP - Installation Map and Clearances

LG LAU126HNP
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14 Room Air Conditioner
Installation
Piping Length And Elevation
Capacity is based on standard length and maximum allowance length is on the basis of
reliability.
Oil trap should be installed every 5~7meters (16.4~23.0ft).
Pipe Size
Capacity
(Btu/h)
Suction
Evap
Max.
length
A m(ft)
Additional Refrigerant
g/m(oz/ft)
Max.
Elevation
B m(ft)
Standard
Length
m(ft)
In case more than 5m(16.4ft)
Outdoor unit
Indoor unit
A
B
Outdoor unit
Indoor unit
A
B
A
Oil trap
Outdoor unit
Indoor unit
B
9k
3/8" 1/4" 7.5(25) 7.5(25) 15(49) 20(0.22)
1/2" 1/4" 7.5(25) 7.5(25) 15(49) 20(0.22)
12k 1/2" 1/4" 7.5(25) 7.5(25) 15(49) 20(0.22)
18k
1/2" 1/4" 7.5(25) 15(49) 30(98) 20(0.22)
5/8" 1/4" 7.5(25) 7.5(25) 15(49) 20(0.22)
24k 5/8" 1/4" 7.5(25) 7.5(25) 15(49) 20(0.22)

Table of Contents

Other manuals for LG LAU126HNP

Related product manuals