EasyManua.ls Logo

LG LAU126HNP - Flaring Work Procedure

LG LAU126HNP
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20 Room Air Conditioner
Installation
Reroute the pipings and the drain hose
across the back of the chassis.
Reroute the pipings and the drain hose
across the back of the chassis.
Drain hose
Vinyl tape(narrow)
Pipe
Wrap with
vinyl tape(wide)
Bundle the piping and drain hose together by
wrapping them with cloth tape over the range within
which they fit into the rear piping housing section.
Piping for
passage through
piping hole
Drain hose
Connecting
cable
Wrap the area which accommodates the rear
piping housing section with vinyl tape.
Vinyl tape(narrow)
Connection
pipe
Connecting cable
Indoor
unit piping
Pipe
Vinyl tape
(wide)
Wrap with vinyl tape

Table of Contents

Other manuals for LG LAU126HNP

Related product manuals