EasyManua.ls Logo

LG LP090CED LP120CED - Suggested Tool Requirements; Preparation of Sleeve; Preparation of the Front Grille

LG LP090CED LP120CED
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
3.2.1 PREPARATION OF SLEEVE
ASSEMBLE THE WALL SLEEVE
Raise the sleeve side panels to upright position as shown on
the right.
Place sleeve upper on top of side panels.
Fasten the four screws as shown on the right.
Assemble the drain kit.
Fasten this assembly to the each side of the wall sleeve as
shown on the right.
Assemble the outdoor grille and fasten the 4 screws as
shown on the right.
3.2.2 PREPARATION OF THE FRONT GRILLE
Carefully remove shipping tape from the front grille.
SCREWDRIVER (FLAT and PHILLIPS), RULER, KNIFE, HAMMER, PENCIL, LEVEL
I
N
D
O
O
R
I
N
D
O
O
R
INDOOR
IN
D
O
O
R
I
N
D
O
O
R
14
12
11
Shipping Tape
I
N
D
O
O
R
3.2 SUGGESTED TOOL REQUIREMENTS
SLEEVE HARDWARE
NUMBER NAME OF PARTS QTY
LOVER SLEEVE 1
UPPER SLEEVE 1
SCREW 4
OUTDOOR GRILLE 1
DRAIN KIT 1

Related product manuals