COMPONENTS TEST PROCEDURE RESULTS
5-11
TIMER MOTOR
(Wire leads removed)
Measure the resistance.
(Ohm-meter scale: R x 100)
Measure the resistance.
(Ohm-meter scale: R x 1000)
Note: A is ON,OFF switch B is
power supply terminal of the
timer motor C is defrost switch
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.