1) For the high/low pressure common pipe, connect both master outside unit and slave outside units to the pipe by using el-
bows.
2) For cutting the pipe, connect the high/low pressure common pipe after removing burrs, dusts and foreign material within
the pipe. Otherwise, the product may not operate due to sludge within the pipe.
3) For the working part leakage test, apply the nitrogen gas pressure of 3.8MPa (38.7kgf/cm
2
).
4) The vacuum criteria is to maintain the vacuum level to less than 5 Torr 1 hour after reaching 5 Torr. (Execute the vacuum
work again when it is below the criteria.)
5) Open the valve with the hexagon wrench.
2 Outside Units 3 Outside Units
Connection of High/Low Pressure Common pipe
26 Outside Unit
Refrigerant piping installation