25
First start-up report and functional testing
The installation, the creation of the electrical connections (except for single-phase products already equipped with a Schuko
plug) or the modification of the electrical connections (change of plug) must be carried out by a qualified technician who must
issue a document/report certifying the correct installation and functional testing has taken place.
In addition to the mandatory documentation required by current legislation, the technician can complete the following FIRST
START-UP AND FUNCTIONAL CHECK REPORT OF THE PRODUCT