EasyManua.ls Logo

Lifetime BIG STUFF 91079 - Page 29

Lifetime BIG STUFF 91079
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS / INSTRUMENTAL Y HERRAJE REQUERIDOS
X SECTION 2 (CONTINUED) / SECTION 2 (SUITE) / SECCIÓN 2 (CONTINUACIÓN)
BTS (x4)
GPH
3/16 in/po (≈5 mm)
(2)
2.1
GPH GPG
GPG
Line up the holes
Alignez les trous
Alinee los orifi cios
2.2
GPH
GPH
GPG
GPG
BTS BTS
BTSBTS
GPL GPL
GPLGPL
GPL (x4)
Place two (2) top climbing wall tubes (GPH) over two (2) bottom climbing wall tubes (GPG). Be sure to line up the holes in
both poles.
Placez deux (2)tubes supérieurs de paroi d’escalade (GPH)sur deux (2)tubes inférieurs de paroi d’escalade (GPG). Assurez-
vous d’aligner les trous des deux pôles.
Coloque dos (2) tubos superiores de pared de escalada (GPH) sobre dos (2) tubos inferiores de pared de escalada (GPG).
Asegúrese de alinear los agujeros en ambos postes.
Attach the two (2) top climbing wall tubes (GPH) the two (2) bottom climbing wall tubes (GPG) with the hardware
indicated.
Fixez les deux (2)tubes supérieurs de paroi d’escalade (GPH)aux deux (2)tubes inférieurs de paroi d’escalade (GPG)avec la
quincaillerie indiquée.
Fije los dos (2) tubos superiores de pared de escalada (GPH) y los dos (2) tubos inferiores de pared de escalada (GPG) con el
herraje indicado.

Related product manuals