EasyManua.ls Logo

Little Cottage Sweetbriar Cottage User Manual

Little Cottage Sweetbriar Cottage
5 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Little Cottage Co.
PO Box 455
Berlin OH 44610
330-893-4212
© 2007 Little Cottage Co.
e Sweetbriar Cottage
Tools Needed:
Cordless drill (12V or higher)
#2 square drive bit
Hammer
6’ step ladder
Tape measure
Square utility knife w/ blade
& hook blade
Question and Answer IconNeed help?

Do you have a question about the Little Cottage Sweetbriar Cottage and is the answer not in the manual?

Little Cottage Sweetbriar Cottage Specifications

General IconGeneral
BrandLittle Cottage
ModelSweetbriar Cottage
CategoryPlay Sets & Playground Equipment
LanguageEnglish

Summary

Sweetbriar Cottage Construction Overview

Kit Contents and Introduction

Welcome message and confirmation of kit contents for the Sweetbriar Cottage.

Securing Side Panels

Attaching the first and opposite side panels to the floor with screws.

Attaching Rear and Front Panels

Securing the rear and front panels, ensuring proper fit and alignment.

Corner and Base Reinforcement

Verifying and securing flush corners and reinforcing the base near the door.

Sweetbriar Cottage Roof Framing

Gable Installation

Attaching the rear and front gables, ensuring proper overhang and alignment.

Rafter Plate Installation

Positioning and securing rafter plates flush with the gable ends.

Center Rafter Placement

Aligning and securing the center rafter onto the rafter plate.

Ridge Beam Installation

Setting and securing the center ridge beam into the gable.

Sweetbriar Cottage Finishing Touches

Completing Corner Trim

Installing and securing corner trim on all sides of the cottage.

Securing Siding

Attaching siding along the bottom of the structure with screws.

Roof Covering Installation

Lifting and securing the roof covering, ensuring even overhang.

Related product manuals