Unpacking
1) Before unpacking the breaker, check that all boxes and packing are in good condition.
2) While unpacking, check the breaker is in good condition.
3) Check that the information given on the rating /accessory nameplates corresponds to the
purchase order.
4) Care about the unpacking to avoid damaging the products. Unpacking them attentively to avoid
dropping the products from carrying components and pallets.
5) Install the products to the final installation place after unpacking as soon as possible. If you
cannot install the products immediately, you had better not unpacking them. Keep the products
indoor around 15 and under 50% of humidity. Standard packing condition for domestic portage
is not suited to outdoor storage. If you cannot keep the maintenance above, you should inspect a
degree of the damages before you install the products. Unsuitable keeping does not guarantee
good qualities of the products and could occur additional danger of an accident.
※ Pallet packing is supplied to customers requiring export and Pallet packing, not domestic.
F. Unpacking
4. 온도 센서 1. Receiving
4. 온도 센서 2. Unpacking
Receiving
A visual inspection inside and out should be performed immediately upon receipt of the
MCCB and before removing it from the truck. Shipping papers should be checked to ensure all
boxes or other accompanying pieces have been received. If any damage or shortages are
evident, a claim should be filed at once with the carrier, and the nearest LSIS sales office. Claims
for shortages or other errors must be made in writing to LSIS within 30 days after receipt of
MCCB. Failure to do so constitutes unqualified acceptance and a waiver of all such claims by the