15
Please read the following check points and caution carefully as they imply the
critical contents which should be confirmed before performing the unpacking,
inspection, or installation, etc.
■ Check points upon receiving
1) A visual inspection – inside and out – should be performed immediately upon receipt of the
MCCB and before removing it from the truck. If any damage or shortages are evident, a claim
should be filed at once with the carrier to the nearest LSIS sales office.
2) Unpacking them attentively to avoid dropping the products from carrying components and
pallets.
3) Install the products to the final installation place after unpacking as soon as possible. If you
cannot install the products immediately, you had better not unpacking them. Keep the
products indoor around 15℃ and under 50% of humidity. Standard packing condition for
domestic portage is not suited to outdoor storage. If you cannot keep the maintenance above,
you should inspect a degree of the damages before you install the products. Unsuitable
keeping does not guarantee good qualities of the products and could occur additional danger
of an accident.
■ Caution for installation inspection
1) Confirm all power sources are completely de-energized first.
2) Disconnect all electrical switches which may operate during inspection.
3) Disconnect all plugs connected to operating part of product (Shunt coil, OCR, etc.)
4) Before you install the product, please make sure to turn the above circuit breaker off.
There is a danger of electric shock during installation.
5) please make sure to handle is in off position .
6) Inspect product.
F. Unpacking
3. Check and Caution