SLC‚ Series 5 Remote Terminal 363-205-401 TOP
Issue 7 March 1997
xiii
Continued on next page
Power Up Tab Index
Element Title
IXL-001 Power Up Cabinet or Frame Power Plant Task Index List
NTP-002 Acceptance
NTP-003 Turn Up J1C182BA Power Shelf and Supporting Equipment in
Frame, 51, 80, or 90-Type Cabinet RT
NTP-004 Add Battery String Equipment to J1C182BA Power Shelf in Frame,
51, 80, or 90-Type Cabinet RT
NTP-005 Turn Up J1C182BB Bulk Power Shelf and Supporting Equipment in
RT Frame
NTP-006 Turn Up J1C182BD Power Shelf in 80A Cabinet
NTP-007 Turn Up ED-7C704-30 Bulk Power Plant in 80E Cabinet
NTP-008 Turn Up J1C182PB-1 Optics Power Shelf and Install AYB1B Optical
Units
DLP-500 Verify Cabinet AC Power Panel Connections
DLP-501 Install Load Distribution Unit (LDU) in Power Shelf
DLP-502 Perform Initial Installation and Tests of Batteries in Frame- Type or
Cabinet-Type RT Enclosure
DLP-503 Perform Initial Installation and Tests of Batteries for 51-Type (ED-
7C601-30) Cabinet RT
DLP-504 Perform Test of RT Batteries Using 197A Battery Load Test Set
DLP-505 Install 337A Battery Charger
DLP-506 Install 336A Rectifiers in J1C182BA Power Shelf
DLP-507 Perform Battery Charger Test
DLP-508 Install 3C Ringing Generators in Power Shelf
DLP-509 Install AUG1 Positive Ring Unit in J1C182BA Power Shelf
DLP-510 Install Bank Fuse Unit (BFU) in Power Shelf
DLP-511 Install and Test Power Converter Unit (PCU) in Facility Shelf
DLP-512 Perform Installation and Tests of Batteries in Existing Frame- Type or
80-Type (ED-7C621-30 or ED-97977-30) Cabinet RT
DLP-513 Perform Installation and Tests of Batteries for Existing 51-Type (ED-
7C601-30) Cabinet RT
DLP-514 Add 337A Battery Chargers to an Existing Frame-Type or 80-Type
Cabinet RT Battery Shelf