EasyManua.ls Logo

Lucent Technologies SLC 5 Series User Manual

Lucent Technologies SLC 5 Series
508 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
363-205-401
Issue 7
March 1997
SLC
®
Series 5 Carrier System
Remote Terminal
Acceptance and Turnup
Task Oriented Practice (TOP)
Question and Answer IconNeed help?

Do you have a question about the Lucent Technologies SLC 5 Series and is the answer not in the manual?

Lucent Technologies SLC 5 Series Specifications

General IconGeneral
BrandLucent Technologies
ModelSLC 5 Series
CategoryTouch terminals
LanguageEnglish

Summary

Introduction and Overview

Overview

Describes the purpose and structure of the document, including major sections.

How to Use This Document

Provides guidance on navigating the document and understanding procedure types.

Conversions

Procedures for converting RT systems between different feature packages.

Feature Packages

FPA

Feature Package A: discontinued availability, provides POTS service only.

FPB

Feature Package B: provides TR-08 interface for universal, integrated applications and special services.

FPC

Feature Package C: offers POTS and special services, no concentration.

FPC-AutoCut

FPC-AutoCut: same features as FPC, allows cutover to FPB without dispatch.

FPD

FPD: provides low bit rate voice FPC capability, reducing digital facility requirements.

FTTH

Fiber to the Home: supported by FPC, FPC-AutoCut, and FPB/SS/M1 or FPB/SS/M2.

FP303

FP303: provides variable concentration of 96 lines on 2, 3, or 4 DS1 facilities.

Acceptance Tab Index

Acceptance

Procedure to verify that the RT enclosure has been properly placed and is not damaged.

Accept Remote Terminal Equipment

Procedure to accept the remote terminal (RT) equipment, including visual inspection.

Accept Distant Terminal Equipment

Procedure to accept the distant terminal (DT) equipment, including visual inspection.

Open RT Cabinet Enclosure

Procedure to open the RT cabinet enclosure using specific tools.

Perform Overall Visual Inspection of Remote Terminal Equipment

Procedure to visually inspect the RT enclosure equipment and ESD ground jack.

Perform Overall Visual Inspection of LGX® Fiber Optic Distributing Frame (FTTH)

Procedure to visually inspect the LGX fiber optic distributing frame (FTTH).

Visually Inspect AC Powering, Grounding, Copper Termination, and Fiber Termination at 900A1 Distant Terminal

Procedure to inspect AC powering, grounding, copper, and fiber termination at a 900A1 distant terminal.

Visually Inspect AC Powering, Grounding, Copper Termination, and Fiber Termination at Collocated Distant Terminal Site

Procedure to inspect AC powering, grounding, copper, and fiber termination at a collocated distant terminal site.

Visually Inspect DC Powering, Grounding, Copper Termination, and Fiber Termination at 900A2 or 900A3 Distant Terminal

Procedure to inspect DC powering, grounding, copper, and fiber termination at 900A2 or 900A3 distant terminal.

Power Up Tab Index

Power Up Cabinet or Frame Power Plant Task Index List

Lists tasks for powering up cabinets or frames.

Acceptance

Procedures to ensure proper installation before equipment turn-up.

Turn Up J1C182BA Power Shelf and Supporting Equipment in Frame, 51, 80, or 90-Type Cabinet RT

Procedure to turn up the J1C182BA power shelf and associated equipment in various cabinet types.

Turn Up J1C182BB Bulk Power Shelf and Supporting Equipment in RT Frame

Procedure to turn up the J1C182BB bulk power shelf and associated equipment in RT frames.

Turn Up J1C182BD Power Shelf In 80A Cabinet

Procedure to turn up the J1C182BD power shelf in an 80A cabinet.

Turn Up ED-7C704-30 Bulk Power Plant in 80D or 80E Cabinet

Procedure to turn up the ED-7C704-30 bulk power plant in cabinets.

Turn Up J1C182PB-1 Optics Power Shelf

Procedure to turn up the J1C182PB-1 optics power shelf.

Verify Cabinet AC Power Panel Connections

Procedure to verify AC power panel connections for the power shelf.

Install Load Distribution Unit (LDU) in Power Shelf

Procedure to install the Load Distribution Unit (LDU) into the power shelf.

Perform Initial Installation and Tests of Batteries in Frame-Type or Cabinet-Type RT Enclosure

Procedure for initial installation and testing of batteries in frame or cabinet RT enclosures.

Install 337A Battery Charger

Procedure to install the 337A battery charger.

Install 336A Rectifiers in J1C182BA Power Shelf

Procedure to install 336A rectifiers in the J1C182BA power shelf.

Install Ringing Switch Unit (RSU) in J1C182BB Bulk Power Shelf

Procedure to install the Ringing Switch Unit (RSU) in the J1C182BB bulk power shelf.

Install 3C( ) Ringing Generators in Power Shelf

Procedure to install 3C( ) Ringing Generators in the power shelf.

Install AUG1 Positive Ring Unit in J1C182BA Power Shelf

Procedure to install the AUG1 Positive Ring Unit in the J1C182BA power shelf.

Install Bank Fuse Unit (BFU) in Power Shelf

Procedure to install the Bank Fuse Unit (BFU) in the power shelf.

Install and Test Power Converter Unit (PCU) in Facility Shelf

Procedure to install and test the Power Converter Unit (PCU) in the facility shelf.

RT Turn Up Tab Index

RT Channel Bank Turn Up Task Index List

Task index listing procedures for turning up RT channel banks.

Acceptance

Procedures to ensure proper installation before RT equipment turn-up.

Turn Up Series 5 RT Blue or White System Equipped for Any Feature Package Except FP 303

Procedure to turn up Series 5 RT systems for any feature package except FP303.

Add Digroups C and D to Existing RT for Any Feature Package

Procedure to add digroups C and D to an in-service RT system.

Test Digital Line Connections to DDM-2000, DDM-1000, or DDM-Plus For Preservice RT (Optional)

Procedure to test digital line connections for preservice RT to DDM equipment.

Turn Up Series 5 RT Blue or White System Equipped for Feature Package 303

Procedure to turn up Series 5 RT systems for Feature Package 303.

Add DS1s to an In-Service Feature Package 303 RT

Procedure to add DS1s to an in-service Feature Package 303 RT.

Clear FAIL LED Problems on a Unit During Turnup and Conversion

Procedure to clear FAIL LED problems during unit turnup and conversion.

Verify That Correct Complement of Circuit Packs is Available

Procedure to verify that the correct circuit packs are available.

DT Turn Up Task Index List

Acceptance

Procedures to ensure proper installation before equipment turn-up.

Turn Up Series 5 Fiber to the Home 900A( ) Distant Terminal

Procedure to turn up Series 5 Fiber to the Home 900A( ) distant terminals.

Converting RT Channel Bank Feature Package

Introduction

Introduces procedures to convert RT channel banks between feature packages.

Feature Packages

Lists and describes available feature packages for SLC Series 5 Carrier System.

Preparation

Details pre-conversion activities like facility changes and testing.

Service Interruption

Summarizes the severity of service interruption for different conversion types.

Logical Progression

Describes the typical logical sequence for converting feature packages.

RT Channel Bank Conversions Task Index List

Acceptance

Procedures to ensure proper installation before RT end conversion.

Convert Series 5 RT from Feature Package A Capability to Feature Package C Capability

Procedure to convert Series 5 RT from Feature Package A to Feature Package C.

Convert Feature Package A or C RT to Feature Package C-AutoCut

Procedure to convert RT from Feature Package A or C to C-AutoCut.

Convert Series 5 RT from Feature Package B Mode 2 to Feature Package B Mode 1

Procedure to convert Series 5 RT from Feature Package B Mode 2 to Mode 1.

Convert Series 5 RT from Feature Package B Mode 1 to Feature Package B Mode 2

Procedure to convert Series 5 RT from Feature Package B Mode 1 to Mode 2.

Add Special Service Capability to Feature Package B RT

Procedure to add special service capability to a Feature Package B RT.

Add or Remove Protection Line Option

Procedure to add or remove a protection line option.

Convert Series 5 RT to Any Feature Package Capability Generic Procedures

Generic procedures for converting Series 5 RT to any feature package.

Convert Feature Package B Mode 1 or Mode 2 to Feature Package 303

Procedure to convert Feature Package B to Feature Package 303.

Reinstate Feature Package B Following a Failed Conversion to Feature Package 303

Procedure to reinstate Feature Package B after a failed conversion to Feature Package 303.

Verify That Correct Complement of Circuit Packs is Available

Procedure to verify that the correct circuit packs are available.

Acceptance

Convert Series 5 RT from Feature Package A Capability to Feature Package C Capability

Convert Series 5 RT from Feature Package B Mode 1 or Mode 2 to Feature Package B Mode 1

Add Special Service Capability to Feature Package B RT

Add or Remove Protection Line Option

Convert Series 5 RT to Any Feature Package Capability Generic Procedures

Convert Series 5 RT from Feature Package B Mode 1 or Mode 2 to Feature Package 303

Reinstate Feature Package B Following a Failed Conversion to Feature Package 303

Clear FAIL LED Problems on a Unit During Turnup and Conversion

Verify That Correct Complement of Circuit Packs is Available

Install AUB26 Alarm Display Unit (ADU) for FPC Conversion

Install Bank Control Unit (BCU) for FPC Conversion

Install Channel Test Unit (CTU)

Install Digital Test Unit (DTU)

Perform RT Indicator Test

Perform Check of RT Remote Alarms

Test Battery String (OPEN BAT TEST)

Install FP303 Bank Control Unit

Set the Option Switches on a C- or D-type LIU

Install AUA74 Line Switch Unit (LSU) in Facility Shelf

Turn Up Fiber to the Home DT

Overview

Provides procedures to equip and turn up Fiber to the Home (FTTH) distant terminals (DTs).

DT Turn Up Task Index List

Acceptance

Procedures to ensure proper installation before equipment turn-up.

Turn Up Series 5 Fiber to the Home 900A( ) Distant Terminal

Procedure to turn up Series 5 Fiber to the Home 900A( ) distant terminals.

Turn Up Series 5 Fiber to the Home 900A( ) Distant Terminal

Turn Up or Add Customer DC Back Powering For 900A2 or 900A3 Distant Terminal

Install ASH1 Power Converter Unit (PCU) in 900A1, 900A2, or 900A3 DT Closure

Install EAF1 Drop Test Card on ASJ2 Channel Unit At Distant Terminal

Install ASJ1 or ASJ2 Channel Unit in 900A1, 900A2, or 900A3 DT Closure

Install AYB1B Optical Unit in 900A1, 900A2, or 900A3 DT Closure

Power Up 900A1, 900A2, or 900A3 DT

Measure Voltages at ASH1 PCU Faceplate

Related product manuals