Do you have a question about the Lucent Technologies SLC 5 Series and is the answer not in the manual?
Brand | Lucent Technologies |
---|---|
Model | SLC 5 Series |
Category | Touch terminals |
Language | English |
Describes the purpose and structure of the document, including major sections.
Provides guidance on navigating the document and understanding procedure types.
Procedures for converting RT systems between different feature packages.
Feature Package A: discontinued availability, provides POTS service only.
Feature Package B: provides TR-08 interface for universal, integrated applications and special services.
Feature Package C: offers POTS and special services, no concentration.
FPC-AutoCut: same features as FPC, allows cutover to FPB without dispatch.
FPD: provides low bit rate voice FPC capability, reducing digital facility requirements.
Fiber to the Home: supported by FPC, FPC-AutoCut, and FPB/SS/M1 or FPB/SS/M2.
FP303: provides variable concentration of 96 lines on 2, 3, or 4 DS1 facilities.
Procedure to verify that the RT enclosure has been properly placed and is not damaged.
Procedure to accept the remote terminal (RT) equipment, including visual inspection.
Procedure to accept the distant terminal (DT) equipment, including visual inspection.
Procedure to open the RT cabinet enclosure using specific tools.
Procedure to visually inspect the RT enclosure equipment and ESD ground jack.
Procedure to visually inspect the LGX fiber optic distributing frame (FTTH).
Procedure to inspect AC powering, grounding, copper, and fiber termination at a 900A1 distant terminal.
Procedure to inspect AC powering, grounding, copper, and fiber termination at a collocated distant terminal site.
Procedure to inspect DC powering, grounding, copper, and fiber termination at 900A2 or 900A3 distant terminal.
Lists tasks for powering up cabinets or frames.
Procedures to ensure proper installation before equipment turn-up.
Procedure to turn up the J1C182BA power shelf and associated equipment in various cabinet types.
Procedure to add battery strings to the J1C182BA power shelf.
Procedure to turn up the J1C182BB bulk power shelf and associated equipment in RT frames.
Procedure to turn up the J1C182BD power shelf in an 80A cabinet.
Procedure to turn up the ED-7C704-30 bulk power plant in cabinets.
Procedure to turn up the J1C182PB-1 optics power shelf.
Procedure to verify AC power panel connections for the power shelf.
Procedure to install the Load Distribution Unit (LDU) into the power shelf.
Procedure for initial installation and testing of batteries in frame or cabinet RT enclosures.
Procedure to install the 337A battery charger.
Procedure to install 336A rectifiers in the J1C182BA power shelf.
Procedure to install the Ringing Switch Unit (RSU) in the J1C182BB bulk power shelf.
Procedure to install 3C( ) Ringing Generators in the power shelf.
Procedure to install the AUG1 Positive Ring Unit in the J1C182BA power shelf.
Procedure to install the Bank Fuse Unit (BFU) in the power shelf.
Procedure to install and test the Power Converter Unit (PCU) in the facility shelf.
Task index listing procedures for turning up RT channel banks.
Procedures to ensure proper installation before RT equipment turn-up.
Procedure to turn up Series 5 RT systems for any feature package except FP303.
Procedure to add digroups C and D to an in-service RT system.
Procedure to test digital line connections for preservice RT to DDM equipment.
Procedure to turn up Series 5 RT systems for Feature Package 303.
Procedure to add DS1s to an in-service Feature Package 303 RT.
Procedure to clear FAIL LED problems during unit turnup and conversion.
Procedure to verify that the correct circuit packs are available.
Procedures to ensure proper installation before equipment turn-up.
Procedure to turn up Series 5 Fiber to the Home 900A( ) distant terminals.
Introduces procedures to convert RT channel banks between feature packages.
Lists and describes available feature packages for SLC Series 5 Carrier System.
Details pre-conversion activities like facility changes and testing.
Summarizes the severity of service interruption for different conversion types.
Describes the typical logical sequence for converting feature packages.
Procedures to ensure proper installation before RT end conversion.
Procedure to convert Series 5 RT from Feature Package A to Feature Package C.
Procedure to convert RT from Feature Package A or C to C-AutoCut.
Procedure to convert Series 5 RT from Feature Package B Mode 2 to Mode 1.
Procedure to convert Series 5 RT from Feature Package B Mode 1 to Mode 2.
Procedure to add special service capability to a Feature Package B RT.
Procedure to add or remove a protection line option.
Generic procedures for converting Series 5 RT to any feature package.
Procedure to convert Feature Package B to Feature Package 303.
Procedure to reinstate Feature Package B after a failed conversion to Feature Package 303.
Procedure to verify that the correct circuit packs are available.
Provides procedures to equip and turn up Fiber to the Home (FTTH) distant terminals (DTs).
Procedures to ensure proper installation before equipment turn-up.
Procedure to turn up Series 5 Fiber to the Home 900A( ) distant terminals.