EasyManua.ls Logo

Lucent Technologies SLC 5 Series - Install Bank Control Unit (BCU) for FPC Conversion

Lucent Technologies SLC 5 Series
508 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
363-205-401 Conversions:
Issue 7, March 1997 Page 1 of 2
DLP-502
Install Bank Control Unit (BCU) for FPC Conversion
1. Get one
MC97756A1 BCU
and inspect for possible damage.
2. Have
LIU
s been removed from channel bank being converted?
If
YES,
then continue with Step
3.
If
NO,
then proceed to Step
4.
3.
NOTE:
MISC1
or
MISC2
indicator on
BCU
will light if either one is connected to
open door closure alarm.
Insert
BCU
into
BCU
slot in channel bank being converted.
Response:
BCU
and
ADU FAIL
indicators are lighted. After approxi-
mately 20 seconds,
BCU
and
ADU FAIL
indicators go off.
ADU MJ
,
NE
and
BCU DIGROUP A, B, C,
and
D
indicators
are lighted.
Proceed to Step
5.
4.
NOTE:
MISC1
or
MISC2
indicator on
BCU
will light if either one is connected to
open door closure alarm.
Insert
BCU
into
BCU
slot in channel bank being converted.
Response:
BCU
and
ADU FAIL
indicators light. After approximately 20
seconds,
BCU
and
ADU FAIL
indicators go off.

Related product manuals