Power Up: DLP-535 363-205-401
Page 8 of 8 Issue 7, March 1997
29. Visually inspect cable assembly between control & distribution panel and bat-
tery string. Replace cable assembly fuse and/or cable assembly until meter
indicates correct voltage.
30. Is this the last battery string to be installed?
If
YES,
then proceed to Step
31.
If
NO,
then repeat from Step
1
for next battery string.
31. Reconnect any battery strings disconnected for battery string voltage mea-
surement. Close and secure doors to battery compartment.
STOP. YOU HAVE COMPLETED THIS PROCEDURE.