EasyManua.ls Logo

Lucent Technologies SLC 5 Series - Page 58

Lucent Technologies SLC 5 Series
508 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
363-205-401 Power Up:
Issue 7, March 1997 Page 1 of 4
NTP-003
Turn Up J1C182BA Power Shelf and Supporting
Equipment in Frame, 51, 80, or 90-Type Cabinet RT
DO ITEMS BELOW IN ORDER LISTED FOR DETAILS, GO TO
1.
NOTE:
This procedure provides steps for the initial installation of the
J1C182BA power shelf and supporting equipment. This
procedure assumes the following:
The outside cable pairs are not closed through to the
RT so that the RT is isolated from the digital and
derived lines.
The frame, 51,80, or 90-type cabinet housing the RT
has been installed.
The J1C182AB or J1C182AE dual channel bank
assembly has been installed in the frame or cabinet
enclosure.
The miscellaneous pair panel, protector connectors,
power shelf, fan shelves, and battery shelves (if
required) have been installed in the frame or cabinet
enclosure.
The acceptance Tab procedures in this volume have
been performed.
This procedure contains instructions concerning the installation of
the various supporting units into the RT assembly shelves, battery
shelves (if required), and power shelf, and for verifying that the
units are operating properly.

Related product manuals