3
Parts and Hardware List
Please read completely through the instructions and verify that all listed parts and hardware
are present before beginning assembly.
A- Top Panel with Metal Frame B- Middle Metal Frame C- Bottom Panel with Metal Frame
(Qty. 1) (Qty. 1) (Qty. 1)
D- Spine Assembly (Qty. 1) E- Leg (Qty. 2) F- Top Frame Support (Qty. 1)
G- Middle Glass Shelf (1) H- Swiveling Bracket (Qty. 1) I- Mounting Frame (Qty. 1)
J- Monitor Bracket (Qty. 2) K- Cable Wheel (Qty. 2) L- Stop Rail (Qty. 1)
(1) 1/2” Bolt (2) 5/8” Bolt (3) 1” Bolt (4) 1-5/8” Bolt
(Qty. 4+1 extra) (Qty. 15+1 extra) (Qty. 6+1 extra) (Qty. 10+1 extra)
(5) 2-1/2” Bolt (6) Lock Washer (7) Flat Washer (8) Flange Nut
(Qty. 1+1 extra) (Qty. 16+1 extra) (Qty.16+1 extra) (Qty. 1+1 extra)
JR
JL