EasyManuals Logo

Manitowoc IYF2100C Technician's Handbook

Manitowoc IYF2100C
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #62 background imageLoading...
Page #62 background image
62 Part Number: 000015431 Rev01 5/19
Water Inlet Valve
The water inlet valve energized in prechill. After water
contacts the low and high water probes the water fill valve
de-energizes. Ice builds on the evaporator and the water
level drops. When water loses contact with the high water
probe, the water fill valve energizes until water contacts
the high water probe again.
Maximum Fill Time = Prechill fill time + first fill + second fill.
SINGLE EVAPORATOR MAXIMUM FILL TIME
Initial startup or startup after automatic shutoff
Prechill (2 minutes) + first fill time (6 minutes) + second fill
time (6 minutes) = 14.0 minutes.
Consecutive cycles
Prechill (30 sec.) + first fill time (6 minutes) + second fill
time (6 minutes) = 12.5 minutes.
DUAL EVAPORATOR MAXIMUM FILL TIMES
Initial startup or startup after automatic shutoff
Prechill (2 minutes) + first fill time (8 minutes) + second fill
time (8 minutes) = 18.0 minutes.
Consecutive cycles
Prechill (30 sec.) + first fill time (8 minutes) + second fill
time (8 minutes) = 16.5 minutes.

Table of Contents

Other manuals for Manitowoc IYF2100C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc IYF2100C and is the answer not in the manual?

Manitowoc IYF2100C Specifications

General IconGeneral
BrandManitowoc
ModelIYF2100C
CategoryIce Maker
LanguageEnglish

Related product manuals