TEST
PROCEDURE
After each service a tightness test of each coupling is mandatory.
The following test parameters are in accordance with EN12266 and EN14432:
Test procedure
Test pressure
Tightness test (liquid
nitrogen)
6 bar +/- 1 bar
leakage for the duration of
Table 1 – Test pressure
Size
Cooling down
Keeping time
DN 25
5 min
30 s
DN 50
10 min
45 s
DN 65
12 min
60 s
DN 80
15 min
60 s
DN 100
18 min
90 s
DN 150
20 min
120 s
Table 2 – Minimum test duration
TEST PROCEDURE:
Connect the hose unit to the tank unit
At the beginning the couplings shall be cooled down by opening the tank with liquid
nitrogen for the cooling down time specified in Table 2.
Maintain the test pressure for the keeping time specified in Table 2.
Determine the leakage rate.
Disconnect the hose unit and the tank unit.
Maintain a test pressure of 5 bar in the tested unit(s) for the keeping time specified in
Table 2
Determine the leakage rate while depressurizing the units.
STORAGE
Store coupling in a dry, dust free, dark place, in ambient temperature.
© Copyright 2008 Mann Teknik AB. Mann Teknik AB reserves the right to make changes at any time in
prices, materials, specifications and models and to discontinue models without notice or obligations.

Other manuals for Manntek DCC