10 of 10 - Version 181002
TEST
PROCEDURE
After each service a tightness test of each coupling is mandatory.
The following test parameters are in accordance with EN12266 and EN14432:
Table 2 – Minimum test duration
TEST PROCEDURE:
• Connect the hose unit to the tank unit
• At the beginning the couplings shall be cooled down by opening the tank with liquid
nitrogen for the cooling down time specified in Table 2.
• Maintain the test pressure for the keeping time specified in Table 2.
• Determine the leakage rate.
• Disconnect the hose unit and the tank unit.
• Maintain a test pressure of 5 bar in the tested unit(s) for the keeping time specified in
Table 2
• Determine the leakage rate while depressurizing the units.
STORAGE
Store coupling in a dry, dust free, dark place, in ambient temperature.