EasyManuals Logo

Marineland Eclipse Three User Manual

Default Icon
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Start Here - Eclipse
®
Systems Three, Six & Twelve Quick Setup Guide
1
3
4
2
A. Add gravel/sand, rock, and
plants with aquarium frame
securely in place.
B. Add water
and conditioner.
Water line
NOTE:
For Saltwater
Kit applications,
follow directions on
Instant Ocean
®
package.
Frame
A. Attach Intake
Assembly to
Pump/Filtration
Assembly.
B. Install Pump/
Filtration Assembly.
C. Mount BIO-Wheel
in special
pin holders.
D. Rinse Filter
Cartridge.
Intake
Assembly
Aquarium
Hood
Pump/Filtration
Assembly
BIO-Wheel
Filter
Cartridge
Rite-Size
®
Cartridge sticker
Aquarium
Frame
A. Route light and
filtration power
cords inside hood.
Cord Routing
Verify the Contents
Prepare Aquarium
Assemble the Filter
E. Install Filter Cartridge
(blue side up).
Adding Fish: Allow your system to operate for 24 hours before adding any fish.
Start with just 1 or 2, adding more gradually over a 4-6 week period. Some fish require a heater.
Questions or missing parts? Call customer service at (800) 322-1266 or visit www.marineland.com
9/06 10958
Light
Switch
NOTE: Drip Loop
(for safety)
B. Route all cords along
back side of aquarium.
Cord Organizer
(Not included with all models)
Aquarium
Remove paper
from BIO-Wheel.
Cord Organizer
(Not included with all models).
Remove covering from adhesive strips,
attach it to outside of aquarium.
Allow adhesive 24 hrs to set.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Marineland Eclipse Three and is the answer not in the manual?

Marineland Eclipse Three Specifications

General IconGeneral
BrandMarineland
ModelEclipse Three
CategoryAquariums
LanguageEnglish

Related product manuals