Martin Engineering M3747-05/12 4 Martin
®
Air Cannon Maintenance Instructions
18. Install compression washers and bolts.
19. Connect air lines and check for leaks.
20. Move the safety slide gate to the open position and install pin.
21. Slowly pressurize the air cannon and check for leaks.
22. Pressurize the air cannon and test fire to make sure all connections are correct.
23. The Martin
®
Hurricane Air Cannon is now ready for operation. Watch air gauge when cannon is fired.
The needle should drop to “zero” instantly. The exhaust port elbows should be pointing down, so dirt
does not fall into the exhaust valve.
Fill Line
Control Line
18
19