EasyManua.ls Logo

Martin M3910 User Manual

Martin M3910
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Martin
®
Electric Vibrators
Operators Manual
M3910
Question and Answer IconNeed help?

Do you have a question about the Martin M3910 and is the answer not in the manual?

Martin M3910 Specifications

General IconGeneral
BrandMartin
ModelM3910
CategoryPower Tool
LanguageEnglish

Summary

Safety and Important Information

Understanding Safety Symbols

Defines DANGER, WARNING, CAUTION, IMPORTANT, and NOTE symbols used in the manual.

Pre-Installation Procedures

Energy Source Lockout/Tagout Procedure

Mandatory procedure to turn off, lockout, tagout, blockout, and test all energy sources before installation.

Cutting and Welding Safety Precautions

Advises testing the atmosphere for gas or dust before cutting or welding in enclosed areas to prevent explosions.

Vibrator Installation Guide

Mounting Bolt Tightening and Torque

Specifies bolt sizes, torque requirements, and tightening sequence for secure vibrator mounting.

Installing Safety Restraining Cable

Procedure for installing the BBAC cable kit to secure the vibrator and prevent falls.

Electrical Connections and Wiring

Wiring Compliance and Diagram Selection

Instructions for wiring according to NEC, finding wiring diagrams on the nameplate, and selecting correct voltage.

Grounding and Wire Connector Assembly

Procedure for properly grounding the vibrator and installing wire connectors and covers.

Overload Protection and Interlocking

Required Overload Protection Installation

Importance of installing overload protection per NEC Article 430 to prevent vibrator damage and voiding warranty.

Operation Checks and Adjustments

Adjusting Eccentric Weights (00-10 Frame)

Guide to adjusting eccentric weights for 00-10 frame models to achieve desired force output.

Adjusting Eccentric Weights (20-105 Frame)

Instructions for adjusting eccentric weights on 20-105 frame models for optimal force and efficiency.

Initial Start-Up and Line Current Monitoring

Steps for initial operation, checking for noise, and monitoring line current against nameplate ratings.

Maintenance and Inspection

Vibrator Lubrication Schedule and Grease

Details on lubrication intervals, grease types (Kluber), and amounts for different vibrator models.

Part Identification and Ordering