INSTALLATION REQUIREMENW$
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Flat-blade screwdriver
#2 Phillips screwdriver
1/4" and 5/16" nut driver Level
recommended)
Tape measure Pliers
Utility knife Tin snips (new vent
installations)
Caulking gun and compound
(new vent installations)
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Tools needed for gas installations:
8" or 10" pipe wrench 8" or 10" adjustable wrench
(for gas connections)
Pipe-joint compound
resistant to LP gas
Parts supplied:
Parts package is located in dryer drum. Check that all parts
are included.
NOTE: Do not use leveling legs supplied with dryer if installing
with a pedestal or a stack kit.
Leveling legs (4)
"Y" connector
Short inlet hose
Long inlet hose
Rubber washers
Min. 8" long Torx_>T25
screwdriver
(for door reversal only)
Parts needed: (Not supplied with dryer)
[] Vent clamps
[] Vent elbows and ductwork
Additional parts may be required, depending in your installation.
Check local codes. Check existing electrical supply and venting.
Read "Electrical Requirements" and "Venting Requirements"
before purchasing parts.
® TORX is a registered trademark of Saturn Fasteners, Inc.
4