EasyManuals Logo
Home>McQuay>Chiller>WSC 126

McQuay WSC 126 User Manual

McQuay WSC 126
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
6 IM 1128-2
4. Install the liquid injection line (see Figure 4). The liquid injection line is attached to the condenser and
has shipping straps securing it to the evaporator and condenser. It, and the compressor, each have a
block-off. Note that any given injection line may be configured somewhat differently than shown on
the drawing.
5. Install the motor cooling line (see Figure 5) using the same procedure as the liquid injection line.
6. Install the motor drain line (see

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the McQuay WSC 126 and is the answer not in the manual?

McQuay WSC 126 Specifications

General IconGeneral
BrandMcQuay
ModelWSC 126
CategoryChiller
LanguageEnglish

Related product manuals