EasyManua.ls Logo

Melges 14 - Step 9: Leading the Cunningham Lines

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
THE MELGES 14 : STEP 9
LEADING THE CUNNINGHAM LINES
Tie the 3 mm X 610 mm spectra line
to the 18 mm double block (#2698)
using a bowline.
Lead the spectra line through the
tack grommet of the sail and tie off on
the eyestrap on top of the boom at the
forward end.
Starting at one of the outboard control
cleats lead the yellow control line through
the cleat, forward to the outboard stand up
29 mm block at the base of the mast, up
through one side of the 18 mm double block,
down through the micro block on the top
of the vang cleat bracket, up through the
other half of the 18mm double block, back
down to the outboard stand up block on
the deck and aft to the outboard control
cleat. Tie figure 8 knots 100 mm from
the end of the control lines.
MELGES.COM MELGES14.COM