EasyManua.ls Logo

Metz Connect E-DAT Series - User Manual

Metz Connect E-DAT Series
2 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
899436
E-DAT kompakte Patchfelder
E-DAT compact Patch Panels
Montagehinweis / Mounting information
E-DAT C6 24x8(8) 1HE LSA Cat.6 Patchfeld Class E
A
Link 500 MHz
E-DAT C6 24x8(8) 1RU LSA Cat.6 Patch Panel Class E
A
Link 500 MHz
130855-E
E-DAT C6
A
24 Port 1HE LSA Cat.6
A
Patchfeld
E-DAT C6
A
24 Port 1RU LSA Cat.6
A
Patch Panel
130855C-E
Öffnen der Geräteabdeckung
Opening of the Panel Cover
Ë
Ê
Ê
Ë
Endmontage
Final assembly
Wichtiger Hinweis (für Betrieb und
Abnahmemessung)
Geräteabdeckung muss aufgesetzt sein, wenn Gerät
in Betrieb ist oder die Abnahmemessung durchgeführt
werden soll.
Important Note (for Operation and Acceptance
Measurement)
The panel cover has to be put on for operation and the
acceptance measurement.
Geräteabdeckung am Patchfeldrahmen ansetzen Ê und nach
unten einrasten Ë.
Apply the cover to the patch panel frame Ê and click it down-
wards into place Ë.
Anschluss des Potentialausgleichs
Fit the earthing lead
Rasthaken leicht eindrücken Ê und die Geräteab deckung
nach oben klappen Ë.
Slightly push-in the snap-fits Ê and turn the cover up Ë.
METZ CONNECT GmbH | Im Tal 2 | 78176 Blumberg | Germany
Tel. +49 7702 533-0 | Fax +49 7702 533-433
Weitere Dokumentationen siehe / Further documentation see www.metz-connect.com
E-DAT design 24x8 Patchfeld Class E / Cat.6 Link bis 250MHz
E-DAT design 24x8 Patch Panel Class E / Cat.6 Link bis 250 MHz
130853-E
Question and Answer IconNeed help?

Do you have a question about the Metz Connect E-DAT Series and is the answer not in the manual?

Summary

E-DAT Compact Patch Panels

Mounting Information

Provides mounting instructions for E-DAT compact patch panels, including product variants and specifications.

Final Assembly Instructions

Opening the Panel Cover

Steps to open the device cover for access, involving pushing snap-fits and lifting.

Important Note for Operation and Measurement

Ensures the panel cover must be on for operation and acceptance measurements.

Earthing Connection

Instructions for fitting the earthing lead to the patch panel frame.

Cable Preparation and Connection

Cable Preparation Steps

Detailed steps for preparing the cable, including sheath stripping, shield management, and wire pair separation.

Pin Assignments

Reference table for T568A and T568B wiring standards for connector pins.

Cable Connection Procedure

Instructions on connecting cables to ports, managing wire pairs and shield foil up to the contacts.

Strain Relief and Shield Clamp

Guidance on creating strain relief with cable ties and attaching the shield connection clamp.

Metz Connect E-DAT Series Specifications

General IconGeneral
ShieldingFoil and braid shielding
Connector TypeRJ45
SeriesE-DAT
Termination TypeIDC
Cable typeCAT6A
Conductor materialCopper
Standards complianceISO/IEC 11801