MG KG - Checking; Terminal Wiring Verification; Power Input Voltage Check; Strain Gauge & Load Cell Check

MG KG
3 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KG / KGS
EM-3556 Rev.3 P. 3 / 3
MG CO., LTD. www.mgco.jp
5-2-55 Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
CHECKING
1) Terminal wiring: Check that all cables are correctly con-
nected according to the connection diagram.
2) Power input voltage: Check voltage across the terminal
7 – 8 with a multimeter.
3) Strain gauge: Check the bridge resistance. Maximum
current is 65mA with excitation 7.5V or less, 35mA with
over 7.5V. Check resistance of load cells.
4) Input: When applying maximum load, check voltage
across the terminal 10 (+) – 11 (–) equals Exc. × Strain
Gauge Sensitivity.
5) Output: Check that the load resistance meets the de-
scribed specifications.
ADJUSTMENT PROCEDURE
FRONT PANEL CONFIGURATION
Zero Adj.
Excitation Adj.
Span Adj.
EXCITATION ADJUSTMENT
The excitation voltage is calibrated at the factory, therefore
will not usually require adjustment, except when used in
combination with a strain gauge of sensitivity other than
described on the specifications.
In that case, adjust to the value calculated by the following
equation:
Excitation [V] =
5 [V] × a [mV/V]
b [mV/V]
where a:
Factory set sensitivity value marked on the product
b: User’s sensitivity value
Adjustable range is within 2V to 10V with bridge resistance
of 350Ω. When the calculated value exceeds 10V, adjust it
to 10V.
ZERO (TARE) ADJUSTMENT
Adjustable from 0 to 80% of the input span (strain gauge
rating). With no load applied, turn the Zero Adjustment
until the output shows 0%.
SPAN (SENSITIVITY) ADJUSTMENT
Adjustable from 20 to 100% of the input span (strain gauge
rating). With the full-scale load, turn the Span Adjustment
until the output shows 100%.
MAINTENANCE
Regular calibration procedure is explained below:
CALIBRATION
Warm up the unit for at least 10 minutes. Apply 0%, 25%,
50%, 75% and 100% input signal. Check that the output
signal for the respective input signal remains within accu-
racy described in the data sheet. When the output is out of
tolerance, recalibrate the unit according to the ADJUST-
MENT PROCEDURE” explained earlier.
LIGHTNING SURGE PROTECTION
We offer a series of lightning surge protector for protec-
tion against induced lightning surges. Please contact us to
choose appropriate models.