EasyManua.ls Logo

microjig ZEROPLAY - Step 6 - Trim Sled to Final Dimensions; Step 7 - Route Dovetail Tracks in Sled Top

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
8
4
After the glue has dried, use a router and flush trim bit to trim the sled top (PARTS B
& C) flush with the sled base (PART A)
*
If your router table fence capacity is less than 8, you can use an auxiliary fence to
complete this step. Click HERE to learn how.
Remove zero-clearance insert, then
route ¼ wide, 11/32 deep relief
grooves in the sled top, 4 and 8 in
from each edge.
Switch to a 1/2 14-degree dovetail
router bit set to 3/8 depth, and
route dovetail tracks in the same
location as the relief grooves.
STEP 6 - TRIM SLED TO FINAL DIMENSIONS
STEP 7 - ROUTE DOVETAIL TRACKS IN SLED TOP