10
Installation Of Hanging Ironing Board
1
Schematic diagram of front installation.
Align the fa stener with the first and second support rods and set at positions.
2
Schematic diagram of top installation.
Shorten the supporting rod to suitable height.
Revolve the hok of hanging ironing board to the side position.
Put the hanging ironing board flat on the top of Clothes rail assembly,put the fixed
column in the middle of hanging ironing board into the right hole,and fixed.
Dismantle by pulling in forward direction
Allow for moving up and down.