1.1 1.1
Packing list and installation components
1
6
6
1
4
1
2
3
4
5
GB845/ST3.9*25-C-H(S)
Φ6*30
RVVP-300/300 3×0.75mm
2
RVV-300/500 3×1.5mm
2
1
2
3
4
5 ————
————
————
————
————
1. Please check the packing list of the centralized controller,whether the components are
complete.
Quantity
Remarks
Matching
resistance 120 Ω
2. Installation assemblies prepared on the site
Name
Remarks
3-core control
shielded cable
2 PCS
1 PCS
1 PCS
2/3 PCS
Several
pieces
3-core cable
Switch box
Wire pipe(jack
casing pipe,
captive nut)
Tighten strip
No.
No.
Quantity
(install into
wall)
Selected model
Name
For power supply of the
centralized controller
For binding cables(as the
case maybe)
Centralized controller
Cross-recessed head tapping
screws
Fastening plastic expansion pipe
Installation & Operation Manual
One for communicating with
the air conditioner; the other
for communicating with the
computer.
Installation & Owner‘s Manual
2