EasyManua.ls Logo

Miele SE 213 - Installation; Building into a base unit

Miele SE 213
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Control unit and hob elec-
tronic control
Building into a base unit
The control unit must be separated
by a removable shelf from the rest
of the space in the base unit, to
make it inaccessible.
Disconnect the mains electricity
supply to the appliance.
Install the hob.
Before building in the control unit
pull the control knobs out of the
openings in the facia.
Draw out the control unit from the re-
taining plate.
Set the control unit retaining plate
into the cut-out base unit facia.
Fix the retaining plate to the side
edges of the base unit cut-out with
2 screws on each side.
Installation
14

Related product manuals