14 (See
BIIFBM13.)
(See BMP130002.)
2
Section A-A: Door Installation
Section C-C: Section D-D:
Section B-B: Door Installation
Install the gasket into the door before
installing the glass. Observe the
location of the rubber seal joint line and
adjust if necessary.
13
11
12
13
13
12
17,18
20
CC
D
D
Ensure that the gasket joint
is at top-dead-center.
Door Glass Installation
Door Assembly
Door Assembly:
4
(6 places)
Shellfront
10
Page (2 / 3)
PELLERIN MILNOR CORPORATIONPELLERIN MILNOR CORPORATION
BMP160021/2017183A
20” Flat Front Door
36 21V5Z, 36 26V5Z, 36 26V7Z, 42 26V6Z, 42 30V6Z0 36021V7Z, 0000
Lock, Hinge, and Door Glass Installation
75