Item
Description Qty
Specifications
Note: Hardware for Section
Application:
Decks may be used singularly or in combination to form the
structures of the Playville System.
Decks may be installed at heights of 0.3m, 0.6m, 0.9m, 1.2m, 1.5m
& 1.8m above ground level.
Maintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
Installation Instructions:
Single
1. Refer to the plan view for the position of the Hex Deck
Section B platform (1).
2. Lift the platform into position in between the four uprights
3. The platform can now be bolted to the uprights using
M10x25mm Torx Bolts (2) with Flat Washers (3) under the
heads.
4. If Joined Sections A & B are required Refer to Drawing
D-34 for instructions & hardware.
Note
: Do not drill hole if not required.
A 5mm hole is in compliance with the Australian Standards
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 500mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
STRUCTURE: ____________________
MIRACLE: ______________________ DATE: ___________