Item
Description Qty
Specifications
Application:
Panels may be used as infill or as roll play items.
This panel is available for 0.3m, 0.6m, 0.9m, 1.2m, 1.5m & 1.8m high
decks or at ground level
Maintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
* Wear Item - Refer Warranty
Installation Instructions:
1. Refer to the plan view for the position of the panel.
2. Attach the three Slide Bars to one of the Rung using Torx
Bolts (ensure the bolt head is inside the Rung).
3. Put three Barrels onto each Slide Bar.
4. Attach the other Rung as before and tighten all bolts.
5. Lift the panel into position and secure with Torx Bolts with
Flat Washers under the heads.
6. Ensure all Bolts are fully tightened.
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 500mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
STRUCTURE: ____________________
MIRACLE: ______________________ DATE: ___________