D HANDRAIL
Item
Description Qty
Specifications
Hand hold for deck entry or exit equipment.
Available in 0.6M, 0.9M, 1.2M, 1.5M and 1.8M heights.
Maintenance
All fasteners should be regularly
checked and retightened, if necessary, 1
week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
* Wear Item - Refer Warranty
Installation Instructions:
1. Refer to drawings for location of D Handrail.
2. Position D Handrail and fix to upright with Torx
Bolts with Flat washers under bolt head.
3. Ensure bolts are tightened prior to use.
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 500mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
STRUCTURE: ____________________
MIRACLE: ______________________ DATE: ___________