All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
*Wear item: See Warranty
Installation Instructions:
1. Locate the Upright on the plan drawing provided.
2. Install Posts so that ID Tag sits at Finished Ground Level
where indicated, use this as master post to give
measurements for other uprights.
3. Allow concrete to cure prior to use.
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 500mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
3-7 Years
7-15 Years
STRUCTURE: ____________________
MIRACLE: ______________________ DATE: ___________