POLY CRAWL TUNNEL
Item
Description Qty
Specifications
Maintenance
All fasteners should be regularly
checked and retightened, if necessary,
1 week after installation.
Ongoing maintenance intervals will vary
according to the amount of use the
equipment receives.
Recommend inspection intervals every 3
months.
* Wear Item - Refer Warranty
Installation Instructions:
1. Refer to the plan view for position of Crawl Tunnel.
2. Lift the Tunnel into position between the two uprights and
secure with for Torx Bolts with Flat Washers under the
heads at each end.
3. Ensure all bolts are fully tightened.
In-ground Upright depth may vary
depending on Softfall
- Sand/Mulch/Grass–700mm (Pictured)
- Rubber – 500mm
+ 300mm Added to Upright depth if
component is Freestanding
+ Use ID tag as reference.
3-7 Years
7-15 Years
STRUCTURE: ____________________
MIRACLE: ______________________ DATE: ___________