Do you have a question about the Mitsubishi PAC-KE07DM-E and is the answer not in the manual?
Essential safety guidelines to follow before commencing the installation of the drain pump unit.
Safety measures for handling removal and electrical tasks to prevent hazards and damage.
Critical safety steps to ensure safe operation during the initial test run of the equipment.
Lists the model name of the drain pump and the compatible air conditioning unit models.
Details all components included in the drain pump package with their quantities and shapes.
Step-by-step instructions for physically mounting the drain pump unit onto the air conditioning system.
Instructions for connecting the primary drain hose to the unit and the drain pump.
Guide for making the necessary electrical connections for the drain pump, including wire routing.
Procedure for inserting drain hose 2 into the drain port and securing it with a band.
Instructions for attaching the field-supplied drain pipe and applying insulation.
Steps to check drainage and install pipe covers to insulate the drain port.
Procedure for adding water to the system to prepare for drain discharge testing.
Steps to conduct a test run to verify normal drain discharge operation and check for leaks.
Actions after confirmation, including turning off power and reattaching covers.
Essential safety guidelines to follow before commencing the installation of the drain pump unit.
Safety measures for handling removal and electrical tasks to prevent hazards and damage.
Critical safety steps to ensure safe operation during the initial test run of the equipment.
Lists the model name of the drain pump and the compatible air conditioning unit models.
Details all components included in the drain pump package with their quantities and shapes.
Step-by-step instructions for physically mounting the drain pump unit onto the air conditioning system.
Instructions for connecting the primary drain hose to the unit and the drain pump.
Guide for making the necessary electrical connections for the drain pump, including wire routing.
Procedure for inserting drain hose 2 into the drain port and securing it with a band.
Instructions for attaching the field-supplied drain pipe and applying insulation.
Steps to check drainage and install pipe covers to insulate the drain port.
Procedure for adding water to the system to prepare for drain discharge testing.
Steps to conduct a test run to verify normal drain discharge operation and check for leaks.
Actions after confirmation, including turning off power and reattaching covers.
| Brand | Mitsubishi |
|---|---|
| Model | PAC-KE07DM-E |
| Category | Water Pump |
| Language | English |
Loading...