EasyManuals Logo

Mitsubishi QD75M2 User Manual

Mitsubishi QD75M2
882 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #353 background imageLoading...
Page #353 background image
8 - 14
MELSEC-Q
8 OPR CONTROL
Operation timing and processing time of fast OPR
The following shows details about the operation timing and time during fast OPR.
t1
t3
t2
In position control
Standing by
Standing by
Positioning start
signal
BUSY signal
Start complete signal
Positioning operation
Md.26 Axis operation status
[Y10,Y11,Y12,Y13]
[X10,X11,X12,X13]
[XC,XD,XE,XF]
Fig. 8.18 Operation timing and processing time of fast OPR
Normal timing time Unit: ms
t1 t2 t3
1.0 to 1.3 2.7 to 4.4 0 to 3.5
•
The t1 timing time could be delayed by the operation state of other axes.
Operating restrictions
When the OPR complete flag (
Md.31
Status: b3) is ON, executing a fast OPR start
will result in an "OPR request ON" error (error code: 207)".

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mitsubishi QD75M2 and is the answer not in the manual?

Mitsubishi QD75M2 Specifications

General IconGeneral
BrandMitsubishi
ModelQD75M2
CategoryController
LanguageEnglish

Related product manuals